South Bangkok Power Plant Replacement Phase 1


Samutprakarn, Thailand

Owner:

Electricity Generating Authority of Thailand.(EGAT)

Project:

South Bangkok Power Plant Replacement Phase1 Project

Engineer:

Marubeni Corporation

Main Contractor:

Nawarat Pattanakarn Public Co.,Ltd.

Foundation Contractor:

Thai Bauer Co.,Ltd

Scope of Works:

§  1,562 nos of Bored pile Dia.600 mm.x 32 m. Depth

§  861 nos of Bored pile Dia.800 mm.x 40-47 m. Depth

Construction Period:

Jul 2017 – Dec 2017

Main Equipment:

2 no.of BG24,1no.BG 15,1no.BG 25  & 4 no.of 70 ton crawler crane.